It's never too early to start
producing in a green way, and these two buildings still under construction are an example. For the realization of this system, our client Schwizer Spenglerei AG chose to use
the ballast with a 5° inclination in different positions to
maximize the energy from the sun during all hours of the day. The ballasts were indeed used both with an exposure to
East-West and with a south exposure, a hybrid mode that is well-suited for the realization of this system both in terms of
optimizing the available space on the roof and for achieving the predefined
production goals. The gravel roof on which the ballasts were installed is just one of the many
application fields of Sun Ballast ballasts that can be installed on a
multitude of flat surfaces without any difficulty since they
do not need to be fixed to the roof. This makes them not only easy and quick to install but also extremely versatile and easy to move in case of maintenance of the system.